video corpo
Add to favorites

#Product Trends

ACIMEX IS PART OF THE WUHAN CHINESE METRO LINE BUILDING

Demoulding VACCUM devices for concrete segments

WUHAN City is actually building a second metro line, line 7, under the YANGSI river.

This line is 30 kms long and includes 19 stations This is the second time that the Chinese city undertakes such a hudge project.

Building under a river involves optimization, This is why the double tunnel is designed for vehicule traffic at the upper stage and metro line the under stage. the Tunnel is built 40 meters deep.

ACIMEX supplies 3 demoulding VACCUM devices for concrete segments. they are heavy duty machines, the heaviest segment weights 15 000 kgs and an average of 7000 kgs.

Line 2 took 4 years from 2004 to 2008, 2017 will achieve the metro construction in Wuhan.

Details

  • Wuhan, Hubei, China
  • ACIMEX