Add to favorites

#Product Trends

Fault Analysis and Solution of Electronic Universal Testing Machine

Electronic Universal Testing Machine Analysis and Solution By after service engineer

Fault Analysis and Solution of Electronic Universal Testing Machine

Electronic universal tensile testing of raw materials, finished products, semi-finished products of physical properties, can do tensile testing, anti-stress test, bending test, to obtain elongation, elongation, stress, strain and other test results and test data. The main test of raw materials, finished products, semi-finished products of physical properties, can do tensile testing, anti-stress test, bending test, to obtain elongation, elongation, stress, strain and other test results and test data. Can be used with different fixtures, accessories, two-point extension, load a variety of tests can be connected to the computer control machine.

Fault Analysis and Solution of Electronic Universal Rally Machine

1, the computer software appears after the message box appears to display overload.

1) Check whether the communication line between the computer and the tensile testing machine is off.

2) Check whether the online selection sensor is selected correctly.

3) Check if the sensor has been hit by the nearest test or operating the keyboard.

4) Check whether the software calibration or calibration function is used before the problem occurs.

5) Check whether the calibration values, calibration values ​​or other information in the hardware parameters have been changed manually.

2, the host power does not shine, can not move up and down.

1) Check whether the access power line is connected properly.

2) Check whether the emergency stop switch is in the twist state.

3) Check whether the access power supply voltage is normal.

4) Check the machine socket on the insurance is blown, please remove the backup fuse can be installed.

3, the host power supply but the device can not move up and down.

1) check whether it is 15S (time) after the device can not move, because the host needs to self-test boot, about 15S time.

2) check whether the upper and lower limits of the appropriate position, there is a certain operating space.

3) Check whether the access power supply voltage is normal.

Details

  • Dongguan, Guangdong, China
  • haida