video corpo
Add to favorites

#Industry News

BVG132/VG75- Latvia

BIOGAS COMPRESSORS / RNG GRID INJECTION

2x BVG 132

LOCATION: LATVIA

FLUID: Biogas

POWER INSTALLED: 150 kW (x2)

INLET PRESSURE: 300 mbar(g)

WORKING PRESSURE: Up to 8 bar(g)

FLOW RATE: 0<600<1120 Nm³/h

AMBIENT TEMPERATURE: +3/+40 °C

VG 75

LOCATION: LATVIA

FLUID: Biomethane

POWER INSTALLED: 90 kW

INLET PRESSURE: 5,5 bar(g)

WORKING PRESSURE: Up to 17 bar(g)

FLOW RATE: 0<625<1250 Nm³/h

AMBIENT TEMPERATURE: +3/+40 °C

A complete automatic solution for biogas upgrading and biomethane grid injection consisting of:

– Two open frame screw compressors for biogas upgrading. They are water cooled and equipped with heat recovery, electro-pneumatic by-pass system, fine filtration and controlled by PLC;

– One open frame screw compressor for biomethane grid injection, It is water cooled and equipped with fine filtration, electro-pneumatic by-pass system and controlled by PLC. All compressors are designed for classified Atex Zone 2 for indoor installation (+3/+40 °C).

BVG132/VG75- Latvia

Details

  • Via Scotte, 8, 36033 Isola Vicentina VI, Italy
  • Adicomp S.r.l.