#Industry News
The Hidden Bottleneck, Why Liquid Cooling Piping Must Leave the Site
From Site Welding to Factory Prefabrication: The Piping Shift That Decides Scaled-Delivery Quality
Liquid cooling projects scaling from dozens of racks to hundreds or thousands share one conclusion: the core bottleneck is not the CDU or cold plate but the secondary-side piping. Site fabrication breaks once projects scale and run in parallel, so piping is moving from on-site cutting, welding and cleaning to factory prefabrication with full-process inspection and digital archives while the site only assembles. Yixintong's prefabricated piping runs 100,000 meters of annual capacity, completes hundreds of racks within days, and includes flushing, pressure testing, water quality testing and chemical dosing in delivery, making piping system-ready. EXTRCOOL provides one-stop liquid cooling solutions.