Liquid-Cooled Container Data Centers, Modular Compute Beyond the Air-Cooling Ceiling
Three Months in the Factory, Five Days on Site and a 1-MW Rated-3 Box at a 2-to-8 Air-Liquid Ratio: Prefab Cooling That Ships, Not Builds
The containerized liquid-cooled data center answers the 100-kilowatt rack with prefabrication: factory-built ISO boxes cut the build cycle from 36 months to 7, on-site labor from 100 to 30 percent and total cost from 100 to 70, the closed loop running from primary cold source through 304 stainless piping and a 200-to-400-kilowatt CDU in 2-plus-1 redundancy to manifolds and UQD couplings leaking no more than 0.05 milliliters. Delivery compresses to three months in the factory, two to four weeks at sea and five days of on-site assembly, and a 1-megawatt overseas deployment meets ANSI/TIA-942-C-2024 Rated 3 with six 100-kilowatt liquid-cooled racks, distributed redundant power and a 2-to-8 air-liquid ratio. EXTRCOOL provides one-stop liquid cooling solutions.