Add to favorites

#Industry News

WATER PUMPING STATION

200 kVA generator

PROBLEM :

Back up the electricity supply to pumps in a water pumping station. The community still has a potable water supply despite power cuts.

SOLUTION :

Install a 200 kVA generator set.

Power : 200 kVA

Details

  • 7 Rue du Bois, 22120 Yffiniac, France
  • GELEC Energy