200tph lead and zinc ore upgrading project in Mali

200tph lead and zinc ore upgrading project in Mali

Place of use: Mali

Raw material: lead and zinc ore

Product size: 15 mm

Work time: 10h(2 shifts)

Ore density: 3.4t/m³

Capacity: 200t/h

The evaluation from customer: I plan to crush the lead and zinc ore and sell them to the local market. The raw material size is around 500mm, then the engineer designs the 2 stage crushing plant for us. One is including vibrating feeder and jaw crusher and other one is including cone crusher and vibrating screen. I am very satisfied with our equipment and introduce them to my friend.