200tph lead and zinc ore upgrading project in Mali
200tph lead and zinc ore upgrading project in Mali
Place of use: Mali
Raw material: lead and zinc ore
Product size: 15 mm
Work time: 10h(2 shifts)
Ore density: 3.4t/m³
Capacity: 200t/h
The evaluation from customer: I plan to crush the lead and zinc ore and sell them to the local market. The raw material size is around 500mm, then the engineer designs the 2 stage crushing plant for us. One is including vibrating feeder and jaw crusher and other one is including cone crusher and vibrating screen. I am very satisfied with our equipment and introduce them to my friend.