Add to favorites

#Industry News

800tph iron ore upgrading project

800tph iron ore upgrading project

Raw material: Imported iron ore

Product size: 200 mesh

Work time: 24h(2 shifts)

Final grade: 62%

The evaluation from customer: We have higher requirements for the final product: grade ≥62%, raw material size≤150mm, product size 200mesh. After their site investigations, the engineers of LIMING Heavy Industry have recommended us the HPT Hydraulic Cone Crusher, ball mill, and magnetic separator as the main equipment, supplemented with Jaw Crusher.

800tph iron ore upgrading project

Details

  • Zhengzhou, Henan, China
  • Henan LIMING Heavy Industry Science and Technology