Key points of warehouse construction with Rack Clad project.

Rack Clad

1. Mechanical calculation of shelf system

2. Design and selection of shelves

3. Meet the relevant design requirements of warehouse buildings, especially fire protection requirements

4. some special requirements for the logistics equipment running in the warehouse with an integrated warehouse and shelf

5. Take care of installation and construction, such as personnel and equipment, large spreaders, strengthen on-site monitoring, and so on.