Juli Sling, showing its talents in the construction of the Greater Bay Area!

Juli Sling, showing its talents in the construction of the Greater Bay Area!

The Shenzhen-Zhongshan Channel is a world-class cross-sea cluster project integrating "bridges, islands, tunnels, and underwater communication", with a total length of 24 kilometers. Among them, the bridge project is about 17.2 kilometers long, and its key control projects are the Lingdingyang Bridge with a main span of 1666 meters and the Zhongshan Bridge with a main span of 580 meters.

The large steel box girder section with a length of 133 meters, a width of 20 meters, a height of 4.7 meters and a weight of 1700 tons was transported to the designated position. The steel box girder spreader developed and manufactured by Juli Rigging guaranteed the smooth implementation of the project.

At the beginning of the design of the hoisting plan, the Juli Rigging project team conducted discussions and demonstrations on the hoisting plan for the above situation. It breaks through the inherent idea of lifting and hoisting steel box girder in the past, greatly optimizes the construction efficiency of steel box girder lifting and transportation, and ensures the safety control of steel girder erection.

Since the construction of the project, Juli Rigging has been deeply involved in it, benchmarking against world-class standards and serving major engineering projects.

In the future, Juli Rigging will continue to act bravely, act as a pioneer, and actively contribute to major projects and infrastructure construction!