#Product Trends
What makes SANY 750t crawler crane a workhorse in Colombian construction projects?
One SANY SCC7500 crawler crane purchased by TRANSPORTES MONTEJO Ltda has been used to undertake the heavy lifting works in major construction projects in Colombia.
One SANY SCC7500 crawler crane purchased by TRANSPORTES MONTEJO Ltda has been used to undertake the heavy lifting works in major construction projects in Colombia.
From February 25 to March 39, 2014, SCC7500 crawler crane with maximum lifting capacity of 750t @ 9m radius was stationed at CEMEX cement factory, being responsible for the lifting of large cement pipes. With 84-meter main boom, single winch, the crawler crane working in HJ operating conditions delivered outstanding load capacity and efficiency.
SCC7500 crawler crane was transferred to the port of Mamonal, Cartagena, north coast of Colombia from July 21 to August 1, taking part in the lifting and installation of large port equipment. The crawler crane adopted HJ operating conditions with main boom length of 42 meters, double main winches, and 250t hook.
The customer is very satisfied with the performance of SCC7500 crawler crane in many projects because it can always get the jobs done quickly and safely no matter when or where it is needed.
With the longest boom of 138m, and the longest boom combination for luffing jib of 90m plus 102m, the SCC7500 crawler crane is capable of supporting as many as six operating conditions, which will fully meet any requirements to match with your working conditions.
Moreover, the adoption of advanced load-sensing system and electronic-over-hydraulic controls ensure smooth micro-movement and stable operation of the crawler crane. Whether it is to work in factory or at port terminals, the crawler crane is easy to operate and control so that the crane operator can fully deal with the complex conditions on site.
Crane safety is also guaranteed in the construction projects. SCC7500 crawler crane is equipped with a variety of safety devices to protect the operator and the machine from potential dangers, such as CAN-bus network, load moment limiter, emergency operation box, winches with height limiter, boom angle limiter, and CCTV monitoring system.