Add to favorites

#Product Trends

Pakistan Telenor BTS SWAP project

Pakistan Telenor BTS SWAP project

In2012, we won the BTS SWAP project in Telenor Pakistan and signed 3 years contract. At the first phase project, we swapped 450 BTS sites and replaced old battery banks and cabinets with our OPzV 2V500AH battery and DC air-conditioner cabinet.

Pakistan Telenor BTS SWAP project

Details

  • Qufu, Jining, Shandong, China
  • Shandong Sacred Sun Power Sources Co.,Ltd.

    Keywords