Add to favorites

#Industry News

Taishan Group 75TPH CFB Boiler EPC Project in Indonesia

The project will supply an efficient and eco-friendly circulating fluidized bed boiler system to the SinoIndonesia Industrial Park in Morowali.

In December 2024, Taishan Group secured an EPC contract for a 75TPH coal-fired CFB boiler in Indonesia. The project involves the design, procurement, and construction of the boiler, which will be used in the hydrometallurgical process of nickel ore. The third-generation low-bed temperature, low-bed pressure boiler will start generating steam by August 2025, supporting sustainable industrial development in the region.

Details

  • Shandong, China
  • Taishan Group Tai’an Boao International Trade Co.,

    Products associated