Add to favorites

#Product Trends

TOPSFLO solves difficulties for coffee machine customers and wins their favor.

TOPSFLO coffee machine pump

German customers are mainly engaged in beverage system design and coffee brewing. For more than 40 years, they have supported the global professional commercial coffee and catering industry including specialty coffee shops, service stations and hotels/catering establishments through innovative cold and hot water systems and coffee brewing machines.

The water temperature of the coffee machine is basically above 97 degrees, and the high temperature resistance of the water pump is very high. As a professional pump manufacturer with more than ten years of experience, Topsflo will consider the temperature resistance when designing the pump:

1. The components are all internationally renowned brands, and each product will be professionally evaluated for reliability and temperature rise of electronic components.

2. The materials of each part of the product are strictly selected and evaluated, and meet the food grade and high temperature 100°C standards.

Recently, the customer Zhejiang factory developed a 3L coffee machine. When the customer tested our B03 small pump, when the water temperature was heated to above 97°, there would be a lot of bubbles in the pipeline, which caused the water flow to decrease. At that time, they tested the same with a German pump. problem. The TOPSFLO business discussed with the project as soon as they learned of the customer's feedback, and the project gave professional installation instructions based on the video sent by the customer. But after the second test, the same problem still appeared. Besides the German pump, the customer also tested the comparison of other domestic pumps and the same problem occurred. Topsflo engineers believe that the compatibility of the pump has a lot to do with the customer's system design. After the video sent back by the customer and the continuous analysis of the pump, TOPSFLO engineers have new ideas, put forward effective suggestions for the customer's system design and optimized the pump structure. In order to solve customer problems faster and ensure the normal operation of customer projects, TOPSFLO engineers worked overtime every night for a week to arrange tests; after continuous research and internal verification, they rushed to Zhejiang to personally guide and conduct face-to-face technical communication with customer engineers . After two days of in-depth research, analysis and testing, the final plan was established, and the customer project was successfully implemented.

For TOPSFLO, although the whole process is full of challenges, we always believe that there are more methods than problems. The customer said: I am very grateful to TOPSFLO for every hard work, especially the timely support of the TOPSFLO technical team. After nine years of cooperation, I am grateful to everyone at TOPSFLO for their efforts, and look forward to a longer and more distant road of cooperation.

Details

  • Changsha, Hunan, China
  • TOPSFLO

    Products associated