Add to favorites

#Product Trends

ABS PLUS: Titanic Mardan Palace, Titanic Hotel Management

Pool Deck Filling // Titanic Hotel Management

Titanic Hotels preferred ABS Disposable Formwork System for pool deck filling at Titanic Mardan Palace Hotel in Lara, Antalya.

Constructing a swimming pool on a flat reinforced concrete foundation or floor slab is much easier and economical than alternative designs. Once the pool sheer walls are erected the pool deck can be constructed using ABS Disposable Formworks. Because the filling is empty inside it could be used as installation passages as well.

Details

  • Aydınevler, 34854 Maltepe/İstanbul, Turkey
  • ABS YAPI