#Industry News
Grupel project for Los Vados WWTP
Supply of 3 gensets of 500, 725 and 1100kVA
In 2023, one of the projects developed and supplied by Grupel served the Los Vados WWTP in Granada, Spain.
Consisting of 3 generator sets of 500, 725 and 1100kVA, the project operates on standby, coming into operation in the event of a grid failure, guaranteeing power to different parts of the facility.
The generators for the Los Vados WWTP have a Grupel engine and alternator and are equipped with a DeepSea controller, remote start and pumped preheating resistors.