Add to favorites

#Industry News

A new 250 KW IREM Pelton Turbine in operation in Japan

The commissioning of a TPA hexagon IREM Pelton turbine-generator unit in the Fukuji plant, located in the prefecture of Okinawa, in Japan, has been inaugurated.

Equipped with an asynchronous generator, the Pelton turbine unit allows easy and safe operation of the hydroelectric plant, ideal for “mini hydro” installations.

The model of the IREM Pelton turbine installed in Fukuji has a nominal power of 250 kW, a nominal head of 88 m and a nominal flow rate of 284 l / s.

IREM Ecowatt Hydro Pelton turbines are reliable and long-lasting industrial products, manufactured in compliance with the Machinery Directive 2006/42 / EC.

The inauguration was a festive occasion attended by authorities and journalists. We thank all the people involved who made this project possible.

Details

  • Via A. Abegg, 75, 10050 Borgone Susa TO, Italy
  • IREM SpA

    Keywords