Add to favorites

#Product Trends

150 IREM ECOWATT HYDRO TURBINES INSTALLED IN NORWAY

A success that is renewed after 27 years: this is the story that IREM has been writing with its distributor FOSSINGKRAFT in Norway for more than 30 years.

This collaboration has now passed the important milestone of the 150th turbine installed on Norwegian territory.

The attention and sensitivity to producing energy from renewable sources has always been fervent in Norway and the IREM-FOSSINGKRAFT team has been present and collaborated continuously over the years.

In 1996, Inge Askeland decided to use the water flowing on her property to generate electricity. Helped by Ulf Andreassen from FOSSINGKRAFT, he quickly found the IREM turbo-alternator that suited him:

- Machine : PELTON 75-200 225M

- Generated Kw: 30kW

27 years pass and Inge Askeland makes a reminder: in 2023 it is he who buys his turbine number 2, or number 150 for Norway.

- Machine: TPA 082-230 060°225SMB 4 4S0A0A

- Generated kW: 40kW

Details

  • Via A. Abegg, 75, 10050 Borgone Susa TO, Italy
  • IREM SpA