Posted on 12/6/2017
On 29 November, COMECA announces it had signed a contract worth €130 million with EDF Energy for the Hinkley Point C (HPC) nuclear power station project in the UK, whose commissioning is scheduled for 2025. The documents were signed in Bristol by Stu
The Group will design, manufacture and deliver power distribution systems that will feed the entire Hinkley Point C site, the first nuclear power station to be built in the UK for a generation. Electrical equipment supplied will have to meet specific standards and detailed specifications, linked to the stringency of the nuclear sector: significant seismic events resista...