Posted on 10/6/2026
180,000 Yuan at the Factory, 400,000 at the Site: Channel Fees, EPC Costs and Warranty Deposits Behind the 2.1-2.3 Multiple
A 1MW secondary CDU quotes about 180,000 yuan but settles around 400,000 at a northwest AI computing center, and the gap is not windfall profit: the 180,000 covers the CDU cabinet alone, while the rest layers channel fees of about 20%, EPC costs of 15% to 45% covering transport, technicians, commissioning and spares, plus settlement of 9% VAT, contingency and warranty de...